commissioning Italy/abroad

Main activities:

  • HW and SW configuration of the subsystems
  • Verification of the subsystems
  • Verification of any integrations between subsystems
  • FAT (Factory acceptance test) and SAT (Site acceptance test) procedures
  • Execution of FAT and SAT tests
  • Tests and graphic report
  • Supervision of the planning and execution of the works